Daris East

Located less than an hour’s drive west of Muscat, the Daris East Prospect benefits from excellent accessibility. It can be reached via the Muscat–Sohar Highway, continuing through Mulladda, followed by a 25 km paved road to Al Hazm, and then an 8 km gravel road leading directly to the site.

Between 2010 and 2012, Alara Resources carried out an extensive exploration program at Daris East, which successfully defined copper-gold resources. A Mining License application, originally submitted in 2012, remains under review with the authorities.

Project Details Information
Commenced
2010
JV Company
Daris Resources LLC (DRL)
Alara’s Interest in JV
50%, with an option to increase to 70%
Commodities
Copper, Gold
Mining License
3.2 km² Applied : pending for grant
Project Stage
Advanced Exploration and Evaluation
Resources
Daris East (measured and indicated): 240,024 tonnes @ 2.37% Cu. JORC Code 2004 Compliant
Shareholders in DRL
Alara Oman Operations Pty Ltd (50%), Al Tamman Trading & Establishment LLC (50%)
For more details visit: